Table of Contents |
---|
Configuration Notes and Constraints
When configuring EFM OAM, pay attention to the following notes:
An EFM connection cannot be established between two EFM OAM entities that are both in passive mode.
Only the active mode end canrun commands ethernet-oam remote-loopback start interface <interface-name> or ethernet-oam remote-loopback stop interface <interface-name> to start | stop EFM OAM remote loopback tests.
Before starting the EFM OAM remote loopback tests, make sure:
The EFM OAM connection has been established successfully.
Users have to configure command set protocols ethernet-oam interface <interface-name> remote-loopback supported on the responding end to enable reactions to loopback control OAMPDUs from peers.
Remote loopback cannot be configured on the same port as the loopback of the physical port.
Configuring EFM OAM
Step 1 Enable EFM OAM function on both end of the link.
...
run show ethernet-oam statistics [interface <interface-name>]
Example for Configuring EFM OAM
Networking Requirements
Figure 1. EFM OAM Configuration Example
...