Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Decommission workflow
    To take a switch down temporarily and then redeploy it in another location, you can Decommission decommission the switch in the AmpCon-DC UI.

  • Operational logs
    You can use operational logs to track all activities and troubleshoot issues by drilling down and analyzing issues operational logs.

  • Monitoring
    Allows drilling down into You can get a overview of all switches or drill down to a switch to look at its current status , and metrics such as port statistics, etc.