Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

You After you add a switch configuration, you must stage these switches the switch to make them it ready for Zero Touch Provisioning (ZTP).

Procedure

  1. In the AmpCon™AmpCon-DC UI, click Service > Switch.

  2. In the Switch list, locate the switch, and then click Stage.

...

  1. Check whether the switch status is shown as Staged.

...

...

After you stage the switch, you can continue to provision new switches with ZTP.