Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 2 Next »

After you create Switch Configs, you can see these switches on the “Switch List page” in the AmpCon-DC UI. You need to stage these switches to make them ready for Zero Touch Provisioning (ZTP). The Staging process includes the following:

  • pushing a PicOS® image

  • configuring the switch

  • installing a valid license in the switch.

Procedure

  1. In the AmpCon-DC UI, click Services > Switch.

  2. In the switch list, click Stage for all the switches.

The deployment status of the switch will then be shown as “Staged”.

Click Services > Switch. In the switch list, click Stage for the switch.

Stage switches 后会发生什么。Switch 状态的变化。

  • No labels