You must stage these switches to make them ready for Zero Touch Provisioning (ZTP).
Procedure
In the AmpCon™-DC UI, click Service > Switch.
In the Switch list, locate the switch, and then click Stage.
Optional: Click Service > Switch, and check whether the switch status is shown as Staged.
Add Comment