You must stage these switches to make them ready for Zero Touch Provisioning (ZTP) deployment. After you add switch configurations, you can see these switches in the “Switch” list of the AmpCon™-DC UI.
Procedure
In the AmpCon-DC UI, click Services > Switch.
In the Switch list, click Stage for each switch that you want to manage with AmpCon-DC.
Optional: Click Service > Switch, and check whether the switch status is “Staged”.
Add Comment