pushing a PicOS® image
configuring the switch
installing a valid license in the switch.
Following are the required steps for the automated provisioning of a new switch:
IT operator racks the new switch, powers the switch on and connects it to either an in-band or out-of-band network.
ONIE (Open Network Install Environment) is required on the Bare Metal switch. Please read the Installing PICOS on Bare Metal Switches using AmpCon document to load properly load the PICOS image.
After loading image, the switch will register with the AmpCon server to get configuration and obtain a valid license.
Prerequisites
Ensure that you have created system config and switch configurations for the Switch to provision. For more information, see Adding System Configurations and Adding Switch Configurations.
Ensure that the Hardware ID of the switch to provision has been added to the AmpCon-DC license. For more information, see Preparing Licenses.
Provisioning White-Box Switches
Download and install MobaXterm.
Open MobaXterm, and then create a session to connect with the switch.
Obtain the PicOS® image from the AmpCon-DC server by running the command:
...
Log in to the AmpCon-DC UI, click Service > Switch. You can see the status of the switch is “Provisioning Success”.
...