PICOS Documentation
Spaces
Apps
Templates
Create
PICOS-3.1_Configuration_Guide
All content
Space settings
Content
Results will update as you type.
A Brief Release Notes for PICOS 3.1.0
Hardware Guides
Hardware Description
Indicator Light on Switch Panel
Port Index Description
Switch Installation
Before Installation
Check the Installation Environment
Install and Remove FRU
Install and Remove RPSU
Installation
Flow Scalability per Broadcom Chipset
Switch Hardware Architecture
PICOS System Configuration Guide
PICOS Routing and Switching Configuration Guide
PICOS Routing and Switching Command Reference
PICOS Open vSwitch Configuration Guide
PICOS Open vSwitch Command Reference
Troubleshooting Guide
Blogs
You‘re viewing this with anonymous access, so some content might be blocked.
Close
PICOS-3.1_Configuration_Guide
/
Switch Installation
Switch Installation
Tracy Yang (Unlicensed)
Owned by
Tracy Yang (Unlicensed)
Dec 16, 2018
Loading data...
Before Installation
Installation
The Switch installation flow chart
Install the switch to the equipment cabinet
Install hangers, slide rail, grounding cable to the switch
Check the Installation Environment
Install and Remove FRU
Install and Remove RPSU