PICOS Documentation
Spaces
Apps
Templates
Create
PICOS-4.4.3_Configuration_Guide
All content
Space settings
Content
Results will update as you type.
•
Release Notes for PICOS 4.4
Hardware Guides
•
Hardware Compatibility
Hardware Use Precautions
Switch Machine Outline and System Characteristics
Indicator Light on Switch Panel
Port Index Description
Switch Installation
•
Before Installation
•
Check the Installation Environment
•
Install and Remove FRU
•
Install and Remove RPSU
Installation
•
Flow Scalability per Broadcom Chipset
•
Switch Hardware Architecture
PICOS System Configuration Guide
PICOS Routing and Switching Configuration Guide
PICOS Routing and Switching Command Reference
PICOS Open vSwitch Configuration Guide
PICOS Open vSwitch Command Reference
Troubleshooting Guide
Blogs
PICOS-4.4.3_Configuration_Guide
/
/
Hardware Guides
/
Switch Installation
Summarize
Switch Installation
Tracy Yang
Owned by
Tracy Yang
Nov 28, 2023
1 min read
Loading data...
Installation
Install hangers, slide rail, grounding cable to the switch
The Switch installation flow chart
Install the switch to the equipment cabinet
Before Installation
Check the Installation Environment
Install and Remove FRU
Install and Remove RPSU
Copyright © 2024 Pica8 Inc. All Rights Reserved.
{"serverDuration": 11, "requestCorrelationId": "46be95503e7849da820cd6fbecd1614e"}