PICOS Documentation
Spaces
Apps
Templates
Create
PICOS-4.4.5_Configuration_Guide
All content
Space settings
Content
Results will update as you type.
•
Release Notes for PICOS 4.4.5
Hardware Guides
Hardware Compatibility
Hardware Use Precautions
Switch Machine Outline and System Characteristics
Indicator Light on Switch Panel
Port Index Description
Switch Installation
•
Before Installation
•
Check the Installation Environment
•
Install and Remove FRU
•
Install and Remove RPSU
Installation
•
Install hangers, slide rail, grounding cable to the switch
•
Install the switch to the equipment cabinet
•
The Switch installation flow chart
•
Flow Scalability per Broadcom Chipset
•
Switch Hardware Architecture
PICOS System Configuration Guide
PICOS Routing and Switching Configuration Guide
PICOS Routing and Switching Command Reference
PICOS Open vSwitch Configuration Guide
PICOS Open vSwitch Command Reference
Troubleshooting Guide
Blogs
PICOS-4.4.5_Configuration_Guide
/
/
Switch Installation
/
Installation
Summarize
Installation
Tracy Yang
Owned by
Tracy Yang
Jul 18, 2024
1 min read
Loading data...
Install hangers, slide rail, grounding cable to the switch
Install the switch to the equipment cabinet
The Switch installation flow chart
Copyright © 2024 Pica8 Inc. All Rights Reserved.
{"serverDuration": 10, "requestCorrelationId": "0cce08ed72fd4e3f9ab4fa979787cff5"}