Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Table of Contents

Push Image before Upgrade






Scheduling Automated Upgrade

For scheduling automated upgrades for one or group of PICOS switches follow these steps:

  1. Follow the instructions in the Setup PICOS image for a specific switch model section and then upload the latest PICOS image for a specific switch model.
  2. Select Lifecycle > Upgrade Firmware menu, click Load, select Group Name, click Schedule Upgrade, enter Start Time and End Time in UTC time zone, and then click Create Task as shown below.

Image RemovedImage AddedImage Removed

Image Added

3. Select Lifecycle > Scheduling to check the status of the scheduled task as shown below:

Image RemovedImage Added

 4. Select the Lifecycle > Upgrade menu, then click the Log icon of the specific switch you have upgraded to see the upgrade operation logs.

Image RemovedImage Added