/
Staging Switches
Staging Switches
After you add a switch configuration, you must stage the switch to make it ready for Zero Touch Provisioning (ZTP).
Procedure
In the AmpCon-Campus UI, click Service > Switch.
In the Switch list, locate the switch, and then click Stage.
Check whether the switch status is shown as Staged.
After you stage the switch, you can continue to provision new switches with ZTP.
Related content
Copyright © 2025 Pica8 Inc. All Rights Reserved.